Nine. Other area

  1. Base on the electricity usagesituation, 70 square millimeter electric cables should be coming fromthe electrical distribution room to each machine in the workshop. All themachine should have their own switch. 

  2. The light switches on first andsecond floor should stay in position. Check if there is any damage, and makesure all switches are working. 

  3. Provide water supply and tubes atwhere needed. 

  4. Provide fire escape signs, securitycameras, and internet for the office based on the new layout.

Ten. Others

  1. The construction unit should selectthe materials based on design and make samples. the construction can only startafter inspection.

  2. All the national construction and acceptance rules should be followed while constructing. 